simone
|
56f9fd1d07
|
docs(phase-12): complete phase execution
Phase 12 (Offer Editor: Tier A/B/C, Tag & Prezzo Pubblico) fully executed
and verified. All 5 plans complete, build gate passed, 5/5 requirements
confirmed in codebase (OFFER-11, OFFER-15, OFFER-16, OFFER-17, OFFER-18).
- 12-REVIEW.md: 0 critical, 6 warnings, 4 info (advisory, non-blocking)
- 12-VERIFICATION.md: all requirements PASS
- REQUIREMENTS.md: OFFER-11/15/16/17/18 → Complete
- STATE.md: advanced to Phase 13 as next
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
|
2026-06-18 17:24:19 +02:00 |
|
simone
|
791a6e64b1
|
chore: merge executor worktree (worktree-agent-a44f854f45ac76582)
|
2026-06-15 10:28:07 +02:00 |
|
simone
|
a486d27a2b
|
docs(12-04): append self-check results to plan summary
|
2026-06-15 10:26:58 +02:00 |
|
simone
|
ca3712612f
|
docs(12-04): add plan summary for offer list page redesign
|
2026-06-15 10:26:38 +02:00 |
|
simone
|
b7203c3da2
|
docs(12-05): complete offer editor detail page plan
- Add 12-05-SUMMARY.md documenting OfferEditorClient + edit route
|
2026-06-15 10:26:24 +02:00 |
|
simone
|
8bdc854a6a
|
docs(12-03): complete offer editor query layer & server actions plan
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
|
2026-06-15 10:18:46 +02:00 |
|
simone
|
d4c89b4170
|
docs(12-02): apply migration 0008 to production (blocking checkpoint complete)
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
|
2026-06-15 09:50:23 +02:00 |
|
simone
|
b80f0563b8
|
docs(12-01): fix markdown lint formatting in summary
- Add blank lines around headings and lists per MD022/MD032
|
2026-06-14 21:21:37 +02:00 |
|
simone
|
bfc99329c5
|
docs(12-01): complete offer tier schema foundation plan
- Add 12-01-SUMMARY.md documenting additive schema extension, migration 0008, and push script
|
2026-06-14 21:20:28 +02:00 |
|
simone
|
1414c3e95c
|
docs(12): finalize wave resequencing in plans and tracking
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
|
2026-06-14 21:15:09 +02:00 |
|
simone
|
640f986967
|
docs(12): create phase plan
Re-scoped Offer Editor (Tier A/B/C, Tag & Prezzo Pubblico) per 2026-06-14
user decision: 5-plan wave structure (schema migration -> prod apply
checkpoint -> query/action layer -> list + detail editor UI), OFFER-12
CSV/Notion import deferred.
|
2026-06-14 21:00:32 +02:00 |
|