Commit Graph

10 Commits

Author SHA1 Message Date
simone 8d62207ccb docs(phase-11): complete phase — OFFER-13 migration applied to prod DB, all validators passed
Tags table + legacy consolidation applied via SSH tunnel to Coolify Postgres.
Both validators: ALL CHECKS PASSED. Protected tables (clients/projects/payments/phases) unchanged.
Phase 11 verification: passed (OFFER-07/08/09/10/13 all Complete).

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-13 20:31:20 +02:00
simone 1e4f917b51 docs(phase-11): add code review + verification (code-complete, DB migration pending)
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-13 16:35:02 +02:00
simone 0387805041 docs(11-04): complete catalog database-view plan
- Mark OFFER-10 complete (REQUIREMENTS.md) — client-side search delivered
- STATE.md: position advanced to Phase 11 plans 1-4 all executed (92%), session/decisions/metrics updated
- 11-04-SUMMARY.md: append self-check results
2026-06-13 16:05:13 +02:00
simone 9bc1e43738 docs(11-04): add plan summary and log unused createService action
- 11-04-SUMMARY.md documents ServiceTable database-view rewrite + CatalogSearch
- deferred-items.md: log now-unused createService/serviceSchema in actions.ts (item 6)
2026-06-13 16:03:10 +02:00
simone e424653ece docs(11-03): complete EditableCell + TagMultiSelect plan
- add 11-03-SUMMARY.md documenting EditableCell/TagMultiSelect delivery
  and the react-hooks lint-rule fix (Rule 1 deviation)
- update STATE.md position (3 of 4 -> 4 of 4), progress 86% -> 89%,
  performance metrics, and decisions log
- log gsd-sdk unavailability and OFFER-07/08 status timing as deferred
  items for Phase 11
2026-06-13 15:56:06 +02:00
simone 62d5e97f39 docs(11-02): complete catalog query layer + server actions plan
- SUMMARY.md for Plan 02 (ServiceWithTags + 4 new server actions)
- STATE.md: advance to Plan 3/4, record metrics and decision
- REQUIREMENTS.md: mark OFFER-07/08/09 backend foundation complete
2026-06-13 15:47:07 +02:00
simone a447494dde docs(11-01): complete plan 1 — tags schema + consolidation scripts, DB-execution gated
- Advance STATE.md to plan 2/4, record metrics/decisions/blocker for 11-01
- Fix Status/Progress fields regressed by state advance-plan (status was
  reset to "Ready to execute" / 0% despite phase being mid-execution)
- Note .planning/ROADMAP.md is an empty PLACEHOLDER (pre-existing v2.1
  planning gap) — roadmap update-plan-progress is a no-op until populated
2026-06-13 15:35:18 +02:00
simone afe789c415 docs(11-01): add execution summary and deferred items log
Documents Phase 11 Plan 1 outcome: tags table schema + migration scripts
complete and committed; DB-execution steps (push migration, run legacy
consolidation, run tag-assignment + validators) blocked by network/SSH
access gate to 178.104.27.55:54321 (firewalled, SSH-only per project
memory). Logs pre-existing drizzle-kit migration tooling drift and the
stale quote_items<->service_catalog JOIN as deferred non-blocking items.
2026-06-13 15:30:03 +02:00
simone d1b1047368 docs(11): create phase plan — 4 plans, 4 waves
Catalog Database-View UX & Legacy Consolidation (OFFER-07/08/09/10/13)
- 11-01: tags table + polymorphic junction + additive legacy migration
- 11-02: getAllServices tag join + inline-edit/tag/quick-add server actions
- 11-03: EditableCell + TagMultiSelect components
- 11-04: database-view ServiceTable + client-side search

Verified by gsd-plan-checker (VERIFICATION PASSED).

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-13 15:07:17 +02:00
simone 03898f2a59 docs(planning): v2.1 milestone setup + Phase 11 context/patterns
- Archive v2.0 phases (07-10) under .planning/milestones/
- v2.1 REQUIREMENTS/ROADMAP (Phases 11-17: Offer Studio + Proposal AI)
- DESIGN-SYSTEM.md (database-view UI contract for Phases 11-14)
- Phase 11 CONTEXT, DISCUSSION-LOG, PATTERNS

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-13 15:07:06 +02:00