Commit Graph

11 Commits

Author SHA1 Message Date
simone 56f9fd1d07 docs(phase-12): complete phase execution
Phase 12 (Offer Editor: Tier A/B/C, Tag & Prezzo Pubblico) fully executed
and verified. All 5 plans complete, build gate passed, 5/5 requirements
confirmed in codebase (OFFER-11, OFFER-15, OFFER-16, OFFER-17, OFFER-18).

- 12-REVIEW.md: 0 critical, 6 warnings, 4 info (advisory, non-blocking)
- 12-VERIFICATION.md: all requirements PASS
- REQUIREMENTS.md: OFFER-11/15/16/17/18 → Complete
- STATE.md: advanced to Phase 13 as next

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-06-18 17:24:19 +02:00
simone 791a6e64b1 chore: merge executor worktree (worktree-agent-a44f854f45ac76582) 2026-06-15 10:28:07 +02:00
simone a486d27a2b docs(12-04): append self-check results to plan summary 2026-06-15 10:26:58 +02:00
simone ca3712612f docs(12-04): add plan summary for offer list page redesign 2026-06-15 10:26:38 +02:00
simone b7203c3da2 docs(12-05): complete offer editor detail page plan
- Add 12-05-SUMMARY.md documenting OfferEditorClient + edit route
2026-06-15 10:26:24 +02:00
simone 8bdc854a6a docs(12-03): complete offer editor query layer & server actions plan
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-06-15 10:18:46 +02:00
simone d4c89b4170 docs(12-02): apply migration 0008 to production (blocking checkpoint complete)
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-15 09:50:23 +02:00
simone b80f0563b8 docs(12-01): fix markdown lint formatting in summary
- Add blank lines around headings and lists per MD022/MD032
2026-06-14 21:21:37 +02:00
simone bfc99329c5 docs(12-01): complete offer tier schema foundation plan
- Add 12-01-SUMMARY.md documenting additive schema extension, migration 0008, and push script
2026-06-14 21:20:28 +02:00
simone 1414c3e95c docs(12): finalize wave resequencing in plans and tracking
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-14 21:15:09 +02:00
simone 640f986967 docs(12): create phase plan
Re-scoped Offer Editor (Tier A/B/C, Tag & Prezzo Pubblico) per 2026-06-14
user decision: 5-plan wave structure (schema migration -> prod apply
checkpoint -> query/action layer -> list + detail editor UI), OFFER-12
CSV/Notion import deferred.
2026-06-14 21:00:32 +02:00