- add 11-03-SUMMARY.md documenting EditableCell/TagMultiSelect delivery
and the react-hooks lint-rule fix (Rule 1 deviation)
- update STATE.md position (3 of 4 -> 4 of 4), progress 86% -> 89%,
performance metrics, and decisions log
- log gsd-sdk unavailability and OFFER-07/08 status timing as deferred
items for Phase 11
- Advance STATE.md to plan 2/4, record metrics/decisions/blocker for 11-01
- Fix Status/Progress fields regressed by state advance-plan (status was
reset to "Ready to execute" / 0% despite phase being mid-execution)
- Note .planning/ROADMAP.md is an empty PLACEHOLDER (pre-existing v2.1
planning gap) — roadmap update-plan-progress is a no-op until populated
Documents Phase 11 Plan 1 outcome: tags table schema + migration scripts
complete and committed; DB-execution steps (push migration, run legacy
consolidation, run tag-assignment + validators) blocked by network/SSH
access gate to 178.104.27.55:54321 (firewalled, SSH-only per project
memory). Logs pre-existing drizzle-kit migration tooling drift and the
stale quote_items<->service_catalog JOIN as deferred non-blocking items.