Documents Phase 11 Plan 1 outcome: tags table schema + migration scripts
complete and committed; DB-execution steps (push migration, run legacy
consolidation, run tag-assignment + validators) blocked by network/SSH
access gate to 178.104.27.55:54321 (firewalled, SSH-only per project
memory). Logs pre-existing drizzle-kit migration tooling drift and the
stale quote_items<->service_catalog JOIN as deferred non-blocking items.