simone
|
243f20f1ad
|
docs(state): phase 7 execution complete — both plans finished (schema migration + admin crud rewire)
|
2026-06-11 06:29:24 +02:00 |
|
simone
|
bbc89136f5
|
docs(state): record phase 7 plan 1 execution completion
Phase 7 Plan 1 (Unified Service Catalog) complete:
- Status: executing (was: planning)
- Progress: 1/5 phases, 1/8 plans completed (12%)
- Current position: Phase 07-unified-service-catalog, Plan 07-01 complete → 07-02 planning
- Last activity: 2026-06-11T04:21:50Z
Phase 7 Plan 1 summary:
- Schema definition with audit trail (migrated_from/migrated_id)
- Idempotent backfill script (56 rows: 21 from service_catalog + 35 from offer_services)
- Zero-data-loss validation suite (5-check verification)
- Database migration pending external connectivity
Next steps: Apply migration when DB reachable, or plan Phase 7-02.
Co-Authored-By: Claude Haiku 4.5 <noreply@anthropic.com>
|
2026-06-11 06:23:12 +02:00 |
|
simone
|
3b1f49d059
|
docs(v2.0): finalize roadmap + requirements — phases 7-11 approved for planning
- Upgrade PROJECT.md: v2.0 Business Operations Suite (unified catalog, offers with phases, public quotes, CRM pipeline, auto-provisioning)
- Create REQUIREMENTS.md sections: CAT-U, OFFER-B, QUOTE, CRM, WIN requirements for phases 7-11
- Extend ROADMAP.md: 5-phase structure (7-11), 14-19 days total, risk/flag registry
- Archive v1.0 milestone (phases 1-6, complete)
- Switch STATE.md to v2.0, status=planning
- Create research documents: STACK.md, FEATURES_v2.0.md, ARCHITECTURE.md, PITFALLS.md, SUMMARY.md
Ready for: /gsd-plan-phase 7
Co-Authored-By: Claude Haiku 4.5 <noreply@anthropic.com>
|
2026-06-11 06:01:59 +02:00 |
|
simone
|
2a5a6fc526
|
docs(phase-5): complete phase execution — Offer System done
|
2026-05-30 16:56:33 +02:00 |
|
simone
|
cd55cba56c
|
docs(05): create Phase 5 Offer System plans — 4 plans in 3 waves
Wave 1: 05-01 schema migration (5 new tables, additive only)
Wave 2: 05-02 offer catalog CRUD (/admin/offers + NavBar)
Wave 3: 05-03 project offer assignment (OffersTab) + 05-04 client dashboard offers + /admin/forecast
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
|
2026-05-30 15:07:52 +02:00 |
|
simone
|
5bf5dfce71
|
infra(04-00): route /c/ → /client/, Dockerfile, Gitea deploy
- Rename src/app/c/[token] → src/app/client/[token]
- Update proxy.ts, ClientRow, admin client detail with /client/ path
- Add output: "standalone" to next.config.ts for Docker build
- Add Dockerfile (multi-stage, node:20-alpine) and .dockerignore
- Push schema to Coolify Postgres via SSH tunnel (drizzle-kit push ✓)
- Update CLAUDE.md constraint 4 to reflect /client/ route
- Add Phase 4 planning artifacts (04-00, 04-RESEARCH, 04-PATTERNS)
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
|
2026-05-21 16:12:05 +02:00 |
|
Simone Cavalli
|
67e4483b48
|
docs(phase-03): complete phase execution — service catalog + quote builder verified
|
2026-05-19 23:12:59 +02:00 |
|
Simone Cavalli
|
88f4e0fb08
|
docs(phase-02): complete phase execution — admin area + interactive features
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
|
2026-05-15 21:55:16 +02:00 |
|
Simone Cavalli
|
447a00cadd
|
docs(phase-02): update tracking after wave 4 completion
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
|
2026-05-15 21:53:07 +02:00 |
|
Simone Cavalli
|
56dd18b0c2
|
docs(02-admin-area-interactive-features): complete phase 2 planning with 4-plan structure
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
|
2026-05-15 10:30:27 +02:00 |
|
Simone Cavalli
|
c22457b9a7
|
docs: mark Phase 1 complete, advance state to Phase 2 planning
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
|
2026-05-14 23:35:46 +02:00 |
|
Simone Cavalli
|
2123dc9d00
|
fix(01-foundation): resolve plan checker blockers — 3 fixes across 01-02, 01-03, 01-04
- 01-02: wave corrected from 1 to 2 (has depends_on: ["01-01"])
- 01-03: middleware rewritten to Edge-compatible fetch pattern; internal API route
app/api/internal/validate-token/route.ts handles DB query in Node.js runtime;
tasks/deliverables queries scoped with inArray(); accepted_total null-coalesced
- 01-04: Task 1 and Task 6 merged → 5 tasks total (was 6, exceeded threshold)
- STATE.md: updated to reflect Phase 1 planning verified, ready for execution
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
|
2026-05-13 15:20:50 +02:00 |
|