--- gsd_state_version: 1.0 milestone: v2.1 milestone_name: milestone status: executing stopped_at: Phase 14 UI-SPEC approved last_updated: "2026-06-14T10:16:13.676Z" last_activity: 2026-06-14 -- Phase 14 planning complete progress: total_phases: 7 completed_phases: 1 total_plans: 7 completed_plans: 4 percent: 57 --- # Project State ## Project Reference See: .planning/PROJECT.md (updated 2026-06-13) **Core value:** Il cliente apre il link e vede esattamente a che punto è il suo progetto, cosa deve ancora succedere e cosa ha già approvato — senza dover scrivere email per chiedere aggiornamenti. **Current focus:** Phase 14 — crm-attio-style-fix ## Current Position Phase: 14 Plan: Not started Status: Ready to execute Last activity: 2026-06-14 -- Phase 14 planning complete Progress: [█████▒░░░░] 57% ## Performance Metrics **Velocity:** - Total plans completed: 4 (v2.1) - Average duration: — - Total execution time: — **By Phase:** | Phase | Plans | Total | Avg/Plan | |-------|-------|-------|----------| | Phase 11 P01 | 25min | 2 tasks | 6 files | | 11 | 4 | - | - | **Recent Trend:** - Last 5 plans: — - Trend: — *Updated after each plan completion* | Phase 11 P02 | 12min | 2 tasks | 2 files | | Phase 11 P03 | 9min | 2 tasks | 2 files | | Phase 11 P04 | 12min | 2 tasks | 4 files | ## Accumulated Context ### Decisions Decisions are logged in PROJECT.md Key Decisions table. Recent decisions affecting current work: - v2.1 roadmap: Offer Studio (Phases 11-15) sequenced before Proposal AI (Phases 16-17) — clean/fast data UX before the AI builder - Phase 11 bundles catalog database-view UX (OFFER-07..10) with legacy consolidation (OFFER-13) since the new UX should be built on a single unified `services` table, not on top of legacy `service_catalog`/`offer_services` - Phase 13 (Workspace — Servizi Attivi) is independent of Phases 11/12 — can execute in parallel order if useful, but numbered after for narrative flow - Phase 15 (Dashboard Revenue Stats / DASH-11) is isolated and BLOCKED on user-provided mockup; no other phase depends on it — can be deferred/skipped without blocking Phase 16/17 - Phase 16/17 split: schema/automation (payment link field + auto-provisioning) first, then AI builder + public page redesign + email — keeps the AI-dependent work last - [Phase 11]: Phase 11: hand-write Drizzle migration SQL (0006_add_tags_table.sql) following the project's established convention since drizzle-kit generate is non-functional (meta snapshots out of sync since migration 0001, pre-existing since Phase 8) — Avoids architectural snapshot-reconciliation work (Rule 4, out of scope) while matching exact precedent from migrations 0003-0005 - [Phase 11]: Phase 11 Plan 02: onConflictDoNothing() without explicit target compiles cleanly for tags table (single unique index tags_entity_name_unique) — used as written in plan, no fallback needed — Avoids unnecessary deviation; Drizzle's no-target ON CONFLICT DO NOTHING is correct given the single unique constraint from Plan 01 - [Phase 11]: Phase 11 Plan 03: removed the plan's prescribed value-sync useEffect (and a follow-up render-time ref-read attempt) from EditableCell — both violate this project's react-hooks lint rules (set-state-in-effect, refs-during-render / React Compiler). tempValue is now only (re)initialized in startEdit()/cancel(), and the toggle display branch reads `value` directly instead of `tempValue` — Rule 1 lint fix, no behavioral change to the 8 spec'd test behaviors - [Phase 11]: Phase 11 Plan 04: left `createService`/`serviceSchema` in `src/app/admin/catalog/actions.ts` as unused dead code after deleting `ServiceForm.tsx` (its only consumer) — `actions.ts` was outside this plan's `files_modified` scope and `updateService` still depends on `serviceSchema`; logged to deferred-items.md for future cleanup ### Pending Todos [From .planning/todos/pending/ — ideas captured during sessions] None yet. ### Blockers/Concerns - **Phase 15 (DASH-11)**: Blocked pending dashboard mockup from user. Do not start until mockup provided; safe to skip in execution order without impacting Phase 16/17. - **Migrations**: Per CLAUDE.md, every phase touching schema (11 legacy consolidation, 13 recurring-revenue tracking, 16 payment link + provisioning) MUST have its migration applied to prod via SSH+docker exec BEFORE pushing dependent code. - Phase 11 Plan 1 (11-01): DB-execution steps blocked — DATABASE_URL (178.104.27.55:54321) firewalled, reachable only via SSH+docker exec on the production host (out of scope for this agent's authorization). Required before OFFER-13/D-02 are satisfied: run scripts/push-11-tags-migration.ts, scripts/migrate-services.ts, scripts/validate-services-migration.ts, scripts/migrate-tags.ts, scripts/validate-tags-migration.ts via an SSH-accessible session (see 11-01-SUMMARY.md 'Issues Encountered' for exact commands). OFFER-13 requirement NOT yet marked complete. ## Deferred Items Items acknowledged and carried forward from previous milestone close: | Category | Item | Status | Deferred At | |----------|------|--------|-------------| | v2 | OFFER-14 — Sezioni analitiche stile Notion (psicologia/rating/performance) | Backlog | v2.1 kickoff | | v2 | AUTH-OTP-01 — Accesso dashboard cliente via OTP email | Design ready, deferred | v2.1 kickoff | | v2 | ARCH-01 — Split modulo "compartimento stagno" in deploy separato | Backlog (only if module grows) | v2.1 kickoff | ## Session Continuity Last session: 2026-06-14T08:54:38.362Z Stopped at: Phase 14 UI-SPEC approved Resume file: .planning/phases/14-crm-attio-style-fix/14-UI-SPEC.md