0387805041
- Mark OFFER-10 complete (REQUIREMENTS.md) — client-side search delivered - STATE.md: position advanced to Phase 11 plans 1-4 all executed (92%), session/decisions/metrics updated - 11-04-SUMMARY.md: append self-check results
104 lines
6.0 KiB
Markdown
104 lines
6.0 KiB
Markdown
---
|
|
gsd_state_version: 1.0
|
|
milestone: v2.1
|
|
milestone_name: milestone
|
|
status: executing
|
|
stopped_at: "11-04: ServiceTable rewritten as database-view (inline edit, tags, quick-add, active/inactive split) + CatalogSearch added — Phase 11 plans 1-4 all executed"
|
|
last_updated: "2026-06-13T14:02:06Z"
|
|
last_activity: 2026-06-13
|
|
progress:
|
|
total_phases: 11
|
|
completed_phases: 8
|
|
total_plans: 37
|
|
completed_plans: 34
|
|
percent: 92
|
|
---
|
|
|
|
# Project State
|
|
|
|
## Project Reference
|
|
|
|
See: .planning/PROJECT.md (updated 2026-06-13)
|
|
|
|
**Core value:** Il cliente apre il link e vede esattamente a che punto è il suo progetto, cosa deve ancora succedere e cosa ha già approvato — senza dover scrivere email per chiedere aggiornamenti.
|
|
|
|
**Current focus:** Phase 11 — catalog-database-view-ux-legacy-consolidation
|
|
|
|
## Current Position
|
|
|
|
Phase: 11 (catalog-database-view-ux-legacy-consolidation) — ALL PLANS EXECUTED
|
|
Plan: 4 of 4 (complete)
|
|
Status: Phase 11 code-complete; pending live-DB migration apply before OFFER-13/end-to-end verification
|
|
Last activity: 2026-06-13
|
|
|
|
Progress: [█████████▒] 92%
|
|
|
|
## Performance Metrics
|
|
|
|
**Velocity:**
|
|
|
|
- Total plans completed: 0 (v2.1)
|
|
- Average duration: —
|
|
- Total execution time: —
|
|
|
|
**By Phase:**
|
|
|
|
| Phase | Plans | Total | Avg/Plan |
|
|
|-------|-------|-------|----------|
|
|
| Phase 11 P01 | 25min | 2 tasks | 6 files |
|
|
|
|
**Recent Trend:**
|
|
|
|
- Last 5 plans: —
|
|
- Trend: —
|
|
|
|
*Updated after each plan completion*
|
|
| Phase 11 P02 | 12min | 2 tasks | 2 files |
|
|
| Phase 11 P03 | 9min | 2 tasks | 2 files |
|
|
| Phase 11 P04 | 12min | 2 tasks | 4 files |
|
|
|
|
## Accumulated Context
|
|
|
|
### Decisions
|
|
|
|
Decisions are logged in PROJECT.md Key Decisions table.
|
|
Recent decisions affecting current work:
|
|
|
|
- v2.1 roadmap: Offer Studio (Phases 11-15) sequenced before Proposal AI (Phases 16-17) — clean/fast data UX before the AI builder
|
|
- Phase 11 bundles catalog database-view UX (OFFER-07..10) with legacy consolidation (OFFER-13) since the new UX should be built on a single unified `services` table, not on top of legacy `service_catalog`/`offer_services`
|
|
- Phase 13 (Workspace — Servizi Attivi) is independent of Phases 11/12 — can execute in parallel order if useful, but numbered after for narrative flow
|
|
- Phase 15 (Dashboard Revenue Stats / DASH-11) is isolated and BLOCKED on user-provided mockup; no other phase depends on it — can be deferred/skipped without blocking Phase 16/17
|
|
- Phase 16/17 split: schema/automation (payment link field + auto-provisioning) first, then AI builder + public page redesign + email — keeps the AI-dependent work last
|
|
- [Phase 11]: Phase 11: hand-write Drizzle migration SQL (0006_add_tags_table.sql) following the project's established convention since drizzle-kit generate is non-functional (meta snapshots out of sync since migration 0001, pre-existing since Phase 8) — Avoids architectural snapshot-reconciliation work (Rule 4, out of scope) while matching exact precedent from migrations 0003-0005
|
|
- [Phase 11]: Phase 11 Plan 02: onConflictDoNothing() without explicit target compiles cleanly for tags table (single unique index tags_entity_name_unique) — used as written in plan, no fallback needed — Avoids unnecessary deviation; Drizzle's no-target ON CONFLICT DO NOTHING is correct given the single unique constraint from Plan 01
|
|
- [Phase 11]: Phase 11 Plan 03: removed the plan's prescribed value-sync useEffect (and a follow-up render-time ref-read attempt) from EditableCell — both violate this project's react-hooks lint rules (set-state-in-effect, refs-during-render / React Compiler). tempValue is now only (re)initialized in startEdit()/cancel(), and the toggle display branch reads `value` directly instead of `tempValue` — Rule 1 lint fix, no behavioral change to the 8 spec'd test behaviors
|
|
- [Phase 11]: Phase 11 Plan 04: left `createService`/`serviceSchema` in `src/app/admin/catalog/actions.ts` as unused dead code after deleting `ServiceForm.tsx` (its only consumer) — `actions.ts` was outside this plan's `files_modified` scope and `updateService` still depends on `serviceSchema`; logged to deferred-items.md for future cleanup
|
|
|
|
### Pending Todos
|
|
|
|
[From .planning/todos/pending/ — ideas captured during sessions]
|
|
|
|
None yet.
|
|
|
|
### Blockers/Concerns
|
|
|
|
- **Phase 15 (DASH-11)**: Blocked pending dashboard mockup from user. Do not start until mockup provided; safe to skip in execution order without impacting Phase 16/17.
|
|
- **Migrations**: Per CLAUDE.md, every phase touching schema (11 legacy consolidation, 13 recurring-revenue tracking, 16 payment link + provisioning) MUST have its migration applied to prod via SSH+docker exec BEFORE pushing dependent code.
|
|
- Phase 11 Plan 1 (11-01): DB-execution steps blocked — DATABASE_URL (178.104.27.55:54321) firewalled, reachable only via SSH+docker exec on the production host (out of scope for this agent's authorization). Required before OFFER-13/D-02 are satisfied: run scripts/push-11-tags-migration.ts, scripts/migrate-services.ts, scripts/validate-services-migration.ts, scripts/migrate-tags.ts, scripts/validate-tags-migration.ts via an SSH-accessible session (see 11-01-SUMMARY.md 'Issues Encountered' for exact commands). OFFER-13 requirement NOT yet marked complete.
|
|
|
|
## Deferred Items
|
|
|
|
Items acknowledged and carried forward from previous milestone close:
|
|
|
|
| Category | Item | Status | Deferred At |
|
|
|----------|------|--------|-------------|
|
|
| v2 | OFFER-14 — Sezioni analitiche stile Notion (psicologia/rating/performance) | Backlog | v2.1 kickoff |
|
|
| v2 | AUTH-OTP-01 — Accesso dashboard cliente via OTP email | Design ready, deferred | v2.1 kickoff |
|
|
| v2 | ARCH-01 — Split modulo "compartimento stagno" in deploy separato | Backlog (only if module grows) | v2.1 kickoff |
|
|
|
|
## Session Continuity
|
|
|
|
Last session: 2026-06-13T14:02:06Z
|
|
Stopped at: 11-04: ServiceTable rewritten as database-view (inline edit, tags, quick-add, active/inactive split) + CatalogSearch added — Phase 11 plans 1-4 all executed, code-complete
|
|
Resume file: .planning/phases/11-catalog-database-view-ux-legacy-consolidation/11-04-SUMMARY.md
|