simone a447494dde docs(11-01): complete plan 1 — tags schema + consolidation scripts, DB-execution gated
- Advance STATE.md to plan 2/4, record metrics/decisions/blocker for 11-01
- Fix Status/Progress fields regressed by state advance-plan (status was
  reset to "Ready to execute" / 0% despite phase being mid-execution)
- Note .planning/ROADMAP.md is an empty PLACEHOLDER (pre-existing v2.1
  planning gap) — roadmap update-plan-progress is a no-op until populated
2026-06-13 15:35:18 +02:00

98 lines
4.4 KiB
Markdown

---
gsd_state_version: 1.0
milestone: v2.1
milestone_name: milestone
status: executing
stopped_at: "11-01: tags schema/scripts committed; DB-execution gated (SSH access required)"
last_updated: "2026-06-13T13:32:41.303Z"
last_activity: 2026-06-13
progress:
total_phases: 11
completed_phases: 8
total_plans: 37
completed_plans: 31
percent: 84
---
# Project State
## Project Reference
See: .planning/PROJECT.md (updated 2026-06-13)
**Core value:** Il cliente apre il link e vede esattamente a che punto è il suo progetto, cosa deve ancora succedere e cosa ha già approvato — senza dover scrivere email per chiedere aggiornamenti.
**Current focus:** Phase 11 — catalog-database-view-ux-legacy-consolidation
## Current Position
Phase: 11 (catalog-database-view-ux-legacy-consolidation) — EXECUTING
Plan: 2 of 4
Status: Executing Phase 11
Last activity: 2026-06-13
Progress: [████████░░] 84%
## Performance Metrics
**Velocity:**
- Total plans completed: 0 (v2.1)
- Average duration: —
- Total execution time: —
**By Phase:**
| Phase | Plans | Total | Avg/Plan |
|-------|-------|-------|----------|
| Phase 11 P01 | 25min | 2 tasks | 6 files |
**Recent Trend:**
- Last 5 plans: —
- Trend: —
*Updated after each plan completion*
## Accumulated Context
### Decisions
Decisions are logged in PROJECT.md Key Decisions table.
Recent decisions affecting current work:
- v2.1 roadmap: Offer Studio (Phases 11-15) sequenced before Proposal AI (Phases 16-17) — clean/fast data UX before the AI builder
- Phase 11 bundles catalog database-view UX (OFFER-07..10) with legacy consolidation (OFFER-13) since the new UX should be built on a single unified `services` table, not on top of legacy `service_catalog`/`offer_services`
- Phase 13 (Workspace — Servizi Attivi) is independent of Phases 11/12 — can execute in parallel order if useful, but numbered after for narrative flow
- Phase 15 (Dashboard Revenue Stats / DASH-11) is isolated and BLOCKED on user-provided mockup; no other phase depends on it — can be deferred/skipped without blocking Phase 16/17
- Phase 16/17 split: schema/automation (payment link field + auto-provisioning) first, then AI builder + public page redesign + email — keeps the AI-dependent work last
- [Phase 11]: Phase 11: hand-write Drizzle migration SQL (0006_add_tags_table.sql) following the project's established convention since drizzle-kit generate is non-functional (meta snapshots out of sync since migration 0001, pre-existing since Phase 8) — Avoids architectural snapshot-reconciliation work (Rule 4, out of scope) while matching exact precedent from migrations 0003-0005
### Pending Todos
[From .planning/todos/pending/ — ideas captured during sessions]
None yet.
### Blockers/Concerns
- **Phase 15 (DASH-11)**: Blocked pending dashboard mockup from user. Do not start until mockup provided; safe to skip in execution order without impacting Phase 16/17.
- **Migrations**: Per CLAUDE.md, every phase touching schema (11 legacy consolidation, 13 recurring-revenue tracking, 16 payment link + provisioning) MUST have its migration applied to prod via SSH+docker exec BEFORE pushing dependent code.
- Phase 11 Plan 1 (11-01): DB-execution steps blocked — DATABASE_URL (178.104.27.55:54321) firewalled, reachable only via SSH+docker exec on the production host (out of scope for this agent's authorization). Required before OFFER-13/D-02 are satisfied: run scripts/push-11-tags-migration.ts, scripts/migrate-services.ts, scripts/validate-services-migration.ts, scripts/migrate-tags.ts, scripts/validate-tags-migration.ts via an SSH-accessible session (see 11-01-SUMMARY.md 'Issues Encountered' for exact commands). OFFER-13 requirement NOT yet marked complete.
## Deferred Items
Items acknowledged and carried forward from previous milestone close:
| Category | Item | Status | Deferred At |
|----------|------|--------|-------------|
| v2 | OFFER-14 — Sezioni analitiche stile Notion (psicologia/rating/performance) | Backlog | v2.1 kickoff |
| v2 | AUTH-OTP-01 — Accesso dashboard cliente via OTP email | Design ready, deferred | v2.1 kickoff |
| v2 | ARCH-01 — Split modulo "compartimento stagno" in deploy separato | Backlog (only if module grows) | v2.1 kickoff |
## Session Continuity
Last session: 2026-06-13T13:32:41.300Z
Stopped at: 11-01: tags schema/scripts committed; DB-execution gated (SSH access required)
Resume file: .planning/phases/11-catalog-database-view-ux-legacy-consolidation/11-01-SUMMARY.md