Files
clienthub/.planning/phases/05-offer-system/05-01-SUMMARY.md
T
simone d670d49048 docs(05-01): create SUMMARY.md for Phase 5 Plan 1 — offer schema migration
- Documents schema.ts changes (5 new tables, relations, TypeScript types)
- Documents Phase 4+5 DB migration applied via SSH due to drizzle-kit TTY limitation
- Confirms zero data loss; all 5 clients and related data preserved
2026-05-30 15:33:42 +02:00

4.7 KiB
Raw Blame History

plan_id, phase, plan, subsystem, tags, dependency_graph, tech_stack, key_files, decisions, metrics
plan_id phase plan subsystem tags dependency_graph tech_stack key_files decisions metrics
05-01 5 1 database
schema
drizzle
migration
offer-system
requires provides affects
offer_macros
offer_micros
offer_services
offer_micro_services
project_offers
projects
settings
src/db/schema.ts
production-db
added patterns
drizzle-orm pgTable
composite primaryKey
onDelete restrict
direct SSH SQL migration
created modified
src/db/schema.ts
Drizzle-kit push TTY limitation bypassed via direct SQL migration over SSH to clienthub-db container
Phase 4 schema (projects, settings, project_id pivot) applied alongside Phase 5 tables in single atomic transaction
One project per client created with deterministic ID (proj_{client_id}) preserving all FK relationships
duration completed tasks_completed files_modified
~20 minutes 2026-05-30 2 1

Phase 5 Plan 1: Schema migration — 5 new offer tables + Drizzle relations Summary

One-liner: Five Offer System tables added to schema.ts and production DB via direct SQL migration, with Phase 4 projects table bootstrapped from existing client data.

Tasks Completed

Task Name Commit Files
1 Append five new table definitions and relations to schema.ts f003441 src/db/schema.ts
2 Run migration — create tables in production database 1b0b2ea (DB only, via SSH)

What Was Built

schema.ts changes (Task 1):

  • Added primaryKey to drizzle-orm/pg-core import
  • Defined 5 new tables: offer_macros, offer_micros, offer_services, offer_micro_services, project_offers
  • Added Drizzle relations for all 5 new tables
  • Added projectOffers: many(project_offers) to projectsRelations
  • Exported 10 new TypeScript types (Select + Insert for each table)

Database migration (Task 2):

  • Applied in a single atomic transaction via direct SQL over SSH to production clienthub-db container
  • Phase 4 additions applied: projects table (5 rows from clients), settings table, slug column on clients
  • Project data pivoted: client_idproject_id across phases (9), payments (10), documents (1), quote_items (3) — zero data loss
  • Phase 5 tables created: all 5 offer tables with correct FK constraints

Deviations from Plan

Auto-fixed Issues

1. [Rule 3 - Blocking] drizzle-kit push TTY requirement blocked non-interactive execution

  • Found during: Task 2
  • Issue: drizzle-kit v0.31.10 requires an interactive TTY for column conflict resolution prompts; the tool cannot be run non-interactively even with --force or --strict flags
  • Fix: Applied migration via direct SQL script executed in clienthub-db Docker container over SSH (docker exec -i clienthub-db psql ... < migration.sql). Used IF NOT EXISTS and ON CONFLICT DO NOTHING for idempotency.
  • Files modified: None (DB only)
  • Commit: 1b0b2ea

2. [Rule 2 - Missing Critical Functionality] Phase 4 DB migration was never applied to production

  • Found during: Task 2 pre-flight check
  • Issue: Production DB was at Phase 3 state (no projects, no settings, client_id columns still present). The app image clienthub:04-08 references projects table which didn't exist. Phase 5 offer tables require FK to projects.
  • Fix: Applied Phase 4 migration (projects table, settings table, project_id pivot) as part of the same transaction, before creating Phase 5 tables. Created one project per client using brand_name as project name and deterministic ID proj_{client_id}.
  • Files modified: None (DB only)
  • Commit: 1b0b2ea

Data Safety Verification

  • Zero destructive SQL: grep -iE 'DROP TABLE|TRUNCATE|DROP COLUMN|DELETE FROM' → no matches
  • All 5 clients preserved (COUNT = 5 before and after)
  • All 9 phases have project_id populated
  • All 10 payments have project_id populated
  • 18 total tables in production DB after migration

Verification Results

  • npx tsc --noEmit → exits 0 (no TypeScript errors)
  • grep -c "offer_macros" src/db/schema.ts → 6 (table def + FK ref + relation + type × 2)
  • grep "primaryKey" src/db/schema.ts → 19 matches (import + composite PK + all table PKs)
  • grep "onDelete.*restrict" src/db/schema.ts → matches on project_offers.micro_id
  • Production DB: all 5 offer tables confirmed present via \dt

Known Stubs

None — this plan is schema-only. No UI or data-access code was written.

Threat Flags

None — no new network endpoints or auth paths introduced. Schema changes are purely additive.

Self-Check: PASSED

  • src/db/schema.ts exists and is modified: FOUND
  • Task 1 commit f003441: FOUND
  • Task 2 commit 1b0b2ea: FOUND
  • All 5 offer tables in production DB: CONFIRMED via SSH verification