Files
clienthub/.planning/STATE.md
T
simone a447494dde docs(11-01): complete plan 1 — tags schema + consolidation scripts, DB-execution gated
- Advance STATE.md to plan 2/4, record metrics/decisions/blocker for 11-01
- Fix Status/Progress fields regressed by state advance-plan (status was
  reset to "Ready to execute" / 0% despite phase being mid-execution)
- Note .planning/ROADMAP.md is an empty PLACEHOLDER (pre-existing v2.1
  planning gap) — roadmap update-plan-progress is a no-op until populated
2026-06-13 15:35:18 +02:00

4.4 KiB

gsd_state_version, milestone, milestone_name, status, stopped_at, last_updated, last_activity, progress
gsd_state_version milestone milestone_name status stopped_at last_updated last_activity progress
1.0 v2.1 milestone executing 11-01: tags schema/scripts committed; DB-execution gated (SSH access required) 2026-06-13T13:32:41.303Z 2026-06-13
total_phases completed_phases total_plans completed_plans percent
11 8 37 31 84

Project State

Project Reference

See: .planning/PROJECT.md (updated 2026-06-13)

Core value: Il cliente apre il link e vede esattamente a che punto è il suo progetto, cosa deve ancora succedere e cosa ha già approvato — senza dover scrivere email per chiedere aggiornamenti.

Current focus: Phase 11 — catalog-database-view-ux-legacy-consolidation

Current Position

Phase: 11 (catalog-database-view-ux-legacy-consolidation) — EXECUTING Plan: 2 of 4 Status: Executing Phase 11 Last activity: 2026-06-13

Progress: [████████░░] 84%

Performance Metrics

Velocity:

  • Total plans completed: 0 (v2.1)
  • Average duration: —
  • Total execution time: —

By Phase:

Phase Plans Total Avg/Plan
Phase 11 P01 25min 2 tasks 6 files

Recent Trend:

  • Last 5 plans: —
  • Trend: —

Updated after each plan completion

Accumulated Context

Decisions

Decisions are logged in PROJECT.md Key Decisions table. Recent decisions affecting current work:

  • v2.1 roadmap: Offer Studio (Phases 11-15) sequenced before Proposal AI (Phases 16-17) — clean/fast data UX before the AI builder
  • Phase 11 bundles catalog database-view UX (OFFER-07..10) with legacy consolidation (OFFER-13) since the new UX should be built on a single unified services table, not on top of legacy service_catalog/offer_services
  • Phase 13 (Workspace — Servizi Attivi) is independent of Phases 11/12 — can execute in parallel order if useful, but numbered after for narrative flow
  • Phase 15 (Dashboard Revenue Stats / DASH-11) is isolated and BLOCKED on user-provided mockup; no other phase depends on it — can be deferred/skipped without blocking Phase 16/17
  • Phase 16/17 split: schema/automation (payment link field + auto-provisioning) first, then AI builder + public page redesign + email — keeps the AI-dependent work last
  • [Phase 11]: Phase 11: hand-write Drizzle migration SQL (0006_add_tags_table.sql) following the project's established convention since drizzle-kit generate is non-functional (meta snapshots out of sync since migration 0001, pre-existing since Phase 8) — Avoids architectural snapshot-reconciliation work (Rule 4, out of scope) while matching exact precedent from migrations 0003-0005

Pending Todos

[From .planning/todos/pending/ — ideas captured during sessions]

None yet.

Blockers/Concerns

  • Phase 15 (DASH-11): Blocked pending dashboard mockup from user. Do not start until mockup provided; safe to skip in execution order without impacting Phase 16/17.
  • Migrations: Per CLAUDE.md, every phase touching schema (11 legacy consolidation, 13 recurring-revenue tracking, 16 payment link + provisioning) MUST have its migration applied to prod via SSH+docker exec BEFORE pushing dependent code.
  • Phase 11 Plan 1 (11-01): DB-execution steps blocked — DATABASE_URL (178.104.27.55:54321) firewalled, reachable only via SSH+docker exec on the production host (out of scope for this agent's authorization). Required before OFFER-13/D-02 are satisfied: run scripts/push-11-tags-migration.ts, scripts/migrate-services.ts, scripts/validate-services-migration.ts, scripts/migrate-tags.ts, scripts/validate-tags-migration.ts via an SSH-accessible session (see 11-01-SUMMARY.md 'Issues Encountered' for exact commands). OFFER-13 requirement NOT yet marked complete.

Deferred Items

Items acknowledged and carried forward from previous milestone close:

Category Item Status Deferred At
v2 OFFER-14 — Sezioni analitiche stile Notion (psicologia/rating/performance) Backlog v2.1 kickoff
v2 AUTH-OTP-01 — Accesso dashboard cliente via OTP email Design ready, deferred v2.1 kickoff
v2 ARCH-01 — Split modulo "compartimento stagno" in deploy separato Backlog (only if module grows) v2.1 kickoff

Session Continuity

Last session: 2026-06-13T13:32:41.300Z Stopped at: 11-01: tags schema/scripts committed; DB-execution gated (SSH access required) Resume file: .planning/phases/11-catalog-database-view-ux-legacy-consolidation/11-01-SUMMARY.md